A 100-ton press was designed and installed to close and form large pieces of ¼- to ½-in. thick sheet metal.

A 100-ton press was designed and installed to close and form large pieces of ¼- to ½-in. thick sheet metal. To extend the press, solenoids 1B, 2A, and 3B (see accompanying schematic) would energize to extend the ram engage the metal while decompression valve 3B and solenoid 2A would de-energize. When pressure at the transducer dropped below 2,000 psi, solenoid 2B would energize to retract the ram.

The flow control was only used to create enough backpressure to keep the pilot-operated check valve open while the ram extended. The pressure-compensated pump had a displacement stroke adjustment to control the ram speed that was needed from time to time.

A problem with the rod-end hose blowing off started when the speed of the ram was reduced to process thinner plates. The hose would fail after several hundred plates were run.

Any idea what was causing the problem?

Solution to last month’s problem:

Pressure Poses Problem

A problem occurred when a freshly filled mold for concrete blocks would open slightly, allowing concrete to leak from the bottom gap of the partially open mold. This happened after a dwell period and resulted in a rejected block because of the void created. An accumulator in the circuit is supposed to prevent momentary pressure dips when an actuator is energized. An accumulator works well if working cycles provide enough dwell time to keep it charged with oil.

In this case, though, the bladder in the accumulator had ruptured, which prevented it from storing pressurized fluid for each work cycle. Replacing the bladder solved the problem.

Congratulations to Bill O’Neill, hydraulic systems engineer at Caterpillar Inc., Peoria, Ill., for solving November’s Challenge and having his name drawn the those who responded correctly.

Bob Sheaf is the founder of CFC Industrial Training, Fairfield, Ohio. He and his company have been involved in troubleshooting, training, and consulting internationally for more than 30 years. For more information, call (513) 874-3225, or visit cfcindustrialtraining.com.

About the Author

Robert Sheaf | President

Robert J. Sheaf Jr., is the founder and president of CFC Insustrial Training, formerly Certified Fluid Consultants, part of CFC-Solar Inc. CFC-Solar provides technical training, consulting, and field services to any industry using fluid power technology. 

Continue Reading

BOOK 2, CHAPTER 12: Fluid Motor Circuits

March 18, 2009
Table of Contents

Motor leakage variations

Oct. 18, 2006
affect low-speed performance

Sponsored Recommendations

All-In-One DC-UPS Power Solutions

March 13, 2024
Introducing the All-In-One DC-UPS, a versatile solution combining multiple functionalities in a single device. Serving as a power supply, battery charger, battery care module,...

Motor Disconnect Switches

March 13, 2024
With experienced Product Engineers and Customer Service personnel, Altech provides solutions to your most pressing application challenges. All with one thought in mind - to ensure...

Industrial Straight-Through Cable Gland

March 13, 2024
Learn more about Altech's cable glands and all they have to offer for your needs!

7 Key Considerations for Selecting a Medical Pump

Feb. 6, 2024
Newcomers to medical device design may think pressure and flow rate are sufficient parameters whenselecting a pump. While this may be true in some industrial applications, medical...